Project Description

The Westgate Manor apartment, newly built in the mature Edmonton neighbourhood of Glenwood, is a multi-family Infill consisting of 20 units across three storeys. The new development was constructed with Ladacor’s Advanced Modular System™, which uses re-purposed Steel Containers as the buildings structural core. An environmentally sustainable solution that provides a far superior steel structure, a faster construction schedule, a higher quality building and lower execution risk with factory manufactured predictability.

"This project is an infill site so it was important we minimize neighbourhood disturbances and this type of construction alleviates that issue."

AJ Slivinski, CEO ofStep Ahead Properties, cites reuse of materials, quick construction, limited disruption as advantages over traditional materials

Previous
Previous

Studio 6 Hotel

Next
Next

CRMR Buffalo Paddock